“Cornerstone
is an excellent firm, with good people, high integrity,
solid leadership, and a strong interest in having
satisfied customers and repeat business."
Vince Huntington, Administrator
Providence Alaska Medical Center
Anchorage, AK
North Expansion/Tenant Improvement
Awards
—
Associated General Contractors 2001 “Excellence
in Construction” - Vertical Construction in Alaska
over $5,000,000 Award
Multiple design and construction phase
project. Phase I included new construction of a 156,000
SF, 4-story
building with updated and expanded Emergency Room,
Entrance/Lobby, Medical Labs & Depts. lease space
for medical offices and other medical facilities. Phases
2 and 3 included over 100,000 SF of extensive interior
renovations in the existing hospital and an addition
to the existing parking garage for a new Heliport.
Additional projects included a number of tenant improvements
and remodels in various locations throughout the medical
center.
Phase 1
• Interim Emergency Dept.
• Pre-Admitting Clinic
• Heliport
• Parking garage update
• New Addition-Core & Shell
• New Emergency Room
• New Gallery
• New Pathology Laboratory
Phase 2
• 3 New Day Surgery Depts.
• Remodel and expand Recovery
• New Endoscopy Dept.
Phase 3
Tenant Improvements:
• Offices
• Administration,
• Conference Rooms,
• New West Laboratory
Added Projects
• Sterile Processing Dept.
• Boiler Room Infrastructure
• Cafeteria Renovation
• Core Lab #2
• Infection Contro
• Cafeteria
• Single Point of Entry
Additional PAMC Projects:
Neo-Natal Intensive Care
New construction included updates and renovations in
the existing medical center. The work continued in the
active, occupied hospital without interruption to hospital
and patient services, so the project was carried out
in three phases.
Intensive Care Unit
Complete tenant improvement of the 20,000SF, 20 bed facility
with all the special medical infrastructure on the
2nd floor of Building E, and a sky bridge from the
ICU from the existing building. Managing, controlling
and maintaining adjacent existing healthcare service
environments during the construction of the ICU presented
significant technical and coordination challenges.
Detailed disruption plans were prepared and submitted
and all work was accomplished with the medical center
in full operations.
Alaska Heart
Institute
Tenant improvement remodel for the Alaska Heart Institute
with anticipated completion
Anchorage Fracture and Orthopedic Clinic
Cornerstone has completed multiple projects for the Anchorage
Fracture and Orthopedic Clinic over the last 8 years.
Construction efforts for the clinic have included over
21,000 SF of tenant improvements to include medical
offices, exam rooms, labs, x-ray rooms, and patient
services areas. Work has included metal framing and
drywall, mechanical , electrical, fire protection,
interior finishes, and furnishings.
Childrens’ Hospital
This project involved converting existing hospital space
to an innovative and state-of-the-art pediatrics treatment
facility. The project was divided into 4 phases to keep
patient and occupant services fully functioning throughout
construction.
The construction work included demolition of existing
patient care areas and construction of new pediatric
patient treatment space as well as installation of numerous
specialty items, unique finishes, and highly sophisticated
mechanical and electrical, and communications systems.
[
Projects Page ]